To use a generator sizing calculator, enter the loads that operate together, their electrical running inputs and starting requirements, the correct voltage/phase, and relevant site conditions. Check steady demand and credible starting events separately, then compare the result with the candidate generator’s kW, kVA, duty and transient capability.

A calculator result becomes useful when its inputs and assumptions can be reproduced. The examples below show a small backup worksheet and a three-phase commercial calculation; neither replaces model-specific application review.

1. Choose a Tool That Answers Your Actual Question

Task Appropriate tool Remaining check
Selected appliances and portable backup Running/starting-watt worksheet Actual appliance data and surge duration
Known kW, kVA or current conversion Electrical unit calculator Phase, voltage and power-factor inputs
Commercial motors and staged loads Manufacturer sizing software Transient performance and site assumptions

Cat’s sizing tools distinguish simpler load entry from more detailed project sizing, including calculated voltage and frequency dips. A unit converter cannot establish that a compressor will start successfully.

2. Prepare the Inputs Before Entering Numbers

Worksheet field Record Why it matters
Equipment Model, quantity and simultaneous quantity Avoids missing units and counting idle spares
Supply Voltage, phase and frequency Capacity cannot correct incompatibility
Running input Electrical W/kW or current/kVA with applicable PF Defines steady demand
Start Total or additional starting watts; current/kVA for motors Defines each transient without double counting
Sequence Already-running loads and credible simultaneous restarts Represents actual operation
Source Nameplate, manual or dated measurement Makes revisions traceable

Motor shaft power differs from electrical input. A motor delivering 15 kW at an assumed 90% efficiency draws 15 / 0.90 = 16.67 kW at that point. Use real input/efficiency data for the installed motor. Do not silently apply a diversity discount to loads that may restart together.

3. Separate Total Startup from Additional Surge

For one motor starting: startup demand = simultaneous running total – that motor’s running watts + its total starting watts. If the tool asks for additional starting watts, enter total startup minus that motor’s running requirement. Adding full startup to a total already including that motor counts its running portion twice.

Check each credible event. The largest motor by nameplate power may not create the largest additional demand. Industrial motor review needs starting current/kVA, acceleration and acceptable voltage/frequency changes; a watt-only total is preliminary. Cummins’ sizing paper includes load-step sequencing and cycling motors.

4. Worked Example: Small Backup Loads

These are hypothetical training inputs for electrically compatible loads, with one of each item. They are not standard appliance ratings.

Load Running W Total starting W Additional W
Lighting/communications 450 450 0
Refrigerator 400 1,400 1,000
Water pump 800 2,800 2,000
Selected small appliances 1,000 1,000 0
  • Running total: 450 + 400 + 800 + 1,000 = 2,650 W.
  • Pump starts while others run: 2,650 – 800 + 2,800 = 4,650 W.
  • Refrigerator starts while others run: 2,650 – 400 + 1,400 = 3,650 W.
  • Both motors restart together: 450 + 1,000 + 1,400 + 2,800 = 5,650 W.

Enforced sequential starting and uncontrolled simultaneous restarting are different requirements. A generator labelled 5,000 W is not automatically suitable: establish whether that is continuous or peak output, the permitted surge duration and actual performance.

Adding 20% to 2,650 W gives 3,180 W. Selecting capacity for an 80% loading target gives 2,650 / 0.80 = 3,312.5 W. These are different planning assumptions; neither replaces the starting check. Count an allowance once and state its purpose.

5. Use Units and Power Factor Correctly

Calculation Formula Condition
Watts to kilowatts kW = W / 1,000 Power, not energy
Real to apparent power kVA = kW / PF Relevant load PF
Single-phase apparent power kVA = V × A / 1,000 RMS voltage and current
Balanced three-phase apparent power kVA = 1.732 × VLL × A / 1,000 Line-to-line RMS voltage and line current
Balanced three-phase real power kW = 1.732 × VLL × A × PF / 1,000 Compatible measurements and PF

Check both generator limits. A hypothetical 50 kVA / 40 kW set cannot carry a 45 kW unity-PF load because its kW limit is exceeded. A 35 kW load at PF 0.60 needs 58.33 kVA, exceeding the kVA limit. Unbalanced and nonlinear loads require appropriate phase and waveform assessment.

Close-up of a generator power outlet panel

6. Worked Example: 400 V Three-Phase Commercial Loads

Assume balanced, linear 400 V three-phase loads at 50 Hz and aggregate PF 0.80 lagging. Electrical running inputs are lighting/services 8 kW, ventilation 10 kW, a process pump 12 kW and other equipment 10 kW.

  • Present running input: 40 kW.
  • Apparent power: 40 / 0.80 = 50 kVA.
  • Line current: 50 × 1,000 / (1.732 × 400) = approximately 72.2 A.
  • Defined future addition: 10 kW at the same aggregate PF.
  • Expanded running case: 50 kW / 0.80 = 62.5 kVA, approximately 90.2 A.

These currents do not select a cable, breaker or ATS by themselves. A candidate providing at least 50 kW and 62.5 kVA at the specified duty and site clears only this running-load screen. Its pump-start performance remains unproved. Request a sizing report covering the starting method, existing load, voltage/frequency dips and recovery, including later cycling starts. Do not round 62.5 kVA to a catalogue size and declare selection complete.

7. Validate the Calculator Result Against the Offered Set

Match duty rating, altitude/temperature output, voltage, phase, frequency, phase loading, special loads and expected minimum/typical/maximum operation. Document the controls enforcing any load-shedding or restart assumptions. An ATS alone does not guarantee sequential motor starting.

Request the exact engine, alternator and controller configuration and acceptance-test scope. Keep preliminary calculations separate from approved installation design. Review prime versus standby ratings before comparing nameplate capacities.

Open diesel generator assembly during inspection

Calculator Questions

Why do tools recommend different capacities? Compare default appliances, total/additional startup inputs, PF, reserve method, simultaneous-load assumptions and rounding. Re-enter identical data before comparing outputs.

Can I use Excel? Yes for a preliminary worksheet. Keep row quantities, running totals and separate starting scenarios explicit; use manufacturer review for industrial transient checks.

Does the result give fuel consumption? No. Obtain the candidate’s fuel curve for the expected load and duty. A kVA result does not establish litres per hour.

Send the Worksheet Alongside the Result

Send destination, application, voltage/phase/frequency, load list, starting data, simultaneous scenarios, duty/hours, future additions, altitude and temperature. Ask for site-rated kW/kVA, the offered configuration and checked starting events. Explore diesel generator configurations and send your sizing inputs to Zentramo.